A
well has been drilled, water pipes are put in the ground,
according to the master plan. Pumps are installed and
ready to be hooked up to any building.
-
Electricity cables are installed under ground and ready
to be connected to bungalows.
-
Terraces are built and ready for the building of the
Villas.
-
The property is surrounded by a fence, and to the road
by a wall, with an entrance gate and a parking area.
-
The parking area has been flattened and prepared for
the restaurant.
-
All building permits (IMB) have been processed and granted.
-
Operational permits and commercial registrations are
granted.
-
Property titles have been issued, and officialy listed.